Thames Water chambers topped with super-secure turrets
Raised chambers housing flow gauges for Londons new multi-million pound super sewer have been secured with intruder-resistant turret tops.Thames Waters extension to the Lee Tunnel ...
Raised chambers housing flow gauges for London's new multi-million pound ‘super sewer’ have been secured with intruder-resistant turret tops.
Thames Water's extension to the Lee Tunnel was opened earlier this year by Foreign Secretary Boris Johnson before he departed his former role as London Mayor. The 4.3 mile-long £678 million project took four years to build and was designed to stop sewage flushing into the River Thames and River Lee. Perimeter security expert Zaun had already secured the access points to the tunnel extension with its most intruder-resistant product, ArmaWeave, installed by Zaun subsidiary Binns Fencing.
ArmaWeave’s unique properties add substantial resistance to cutting attacks with hand, powered and non-contact tools. The tight mesh pattern provides no climbing aids, again limiting the potential for intrusion. Zaun designed two bespoke ‘cages’ from ArmaWeave with special fixings and topped with 980 razor coil to protect the flow gauge chambers.
On average 39 million tonnes of untreated sewage mixed with rain water gets discharged into the River Thames from overloaded treatment works and combined sewer outfalls every year. The biggest of these outfalls, at Abbey Mills pumping station, has been discharging 16 million tonnes of sewage per year to the River Lee. The £678 million Lee Tunnel – the largest single project in the history of the privatised water industry in England and Wales, and the deepest ever bored under London at 75 metres deep – will capture this sewage to keep it out of the River Lee.
The Lee Tunnel connects the Abbey Mills Water Treatment Centre to Beckton Sewage Treatment Works, Europe's largest such site, both if which are also secured by Zaun perimeter protection. The Thames Tideway Tunnel will connect to the Lee Tunnel and will capture sewage from the remaining 34 combined sewer overflows, keeping it out of the River Thames.
Business Partner
Zaun Fencing LtdSteel Drive
WV10 9ED Wolverhampton
UK
most read
Madrid Multi-residential Complex Streamlines Operations With Assa Abloy Mobile Digital Access
Tenant and homeowner expectations in the multi-residential sector are evolving fast. Digital access offers a solution which fits a contemporary ethos blending design, functionality, technology and sustainability.
Assa Abloy: How Access Solutions Can Impact Sustainability Performance Across the Full Life-cycle of a Building
Embedding sustainability within any organization requires a broad, strategic perspective. Scrutiny should include the physical infrastructure itself: According to the IEA, buildings consume around 30 percent of global energy.
BSIA and Nineteen Group Sign Exclusive Agreement
The British Security Industry Association (BSIA) has signed an exclusive partnership agreement with the Nineteen Group and will be participating in their security related events during 2024.
Altronix Unveils Power and Data Protection at ISC West
Altronix has unveiled the latest critical infrastructure protection in power and data transmission for the professional security industry at ISC West.
30-Year Evolution of Fire Protection in Trains
Wagner Rail offer their perspective on the 30-year evolution of fire protection on trains as rail passenger transport recovers post COVID and passengers and staff expect optimum safety.